Shenyang zhongda steel structure engineering co. LTD.
Contact: mu guoyu.
Telephone: 13940509290
Email address: muguoyu@zhongdabuild.com
Address: zhai jia development zone, tiexi district, shenyang city.
Zip code: 110178
Liaoning zhongda shengbang industrial co. LTD.
Contact: liu chang.
Telephone: 13889862778
Email address: liuchang@zhongdabuild.com
Address: no. 109, quanyun road, shenyang district, China (liaoning) free trade test zone.
Zip code: 110209
Telephone: 0086-24-89355770 89355771.
Website: en.zhongdabuild.com
This stream spans the crown of the prince.
East the bridge the liberation way to square, north through the bridge on the west side of the irs, across Shen Dan railway hub, benxi steel yard, marina henan road, north binhe road of taizi river to the stream color flat road intersection under the bridge. The route is 1037 meters long and the bridge is 866 meters long. Among them, the bridge is about 300 meters long, and the design of the arch cable-stayed bridge is adopted. The arch bridge tower is located on the outside of the main bridge. The cross section is the rectangular steel box with variable section. The bridge tower is 65 meters high, the main span is 145 meters, and the Angle of tilt is 15 degrees. The bridge tower adopts the oblique crescent shape, which meets the requirements of the bridge width and the magnificent momentum, the design technology is advanced, the style is beautiful. Because of the large span, it can effectively reduce the resistance of the river and it is very beneficial to the taizi river. The two roads in the north and south of binhe are designed on the ramp, and the vehicles can be built up and down the new bridge. According to the traffic condition of the vehicles in our city, the design width of the bridge across the river is 21.5 meters, and the pavement is 2.5 meters wide on both sides. The bridge has a two-way 4 lane with a design speed of 60 kilometers per hour and a life span of 100 years.