沈阳中达钢结构工程有限公司
HENYANG ZHONGDA STEEL STRUCTURE ENGINEERING CO. LTD
SHENYANG ZHONGDA STEEL STRUCTURE ENGINEERING CO. LTD
LIAONING ZHONGDA SHENGBANG INDUSTRIAL CO. LTD
LIAONING ZHONGDA SHENGBANG INDUSTRIAL CO. LTD

Product

hot key words

contact us

Shenyang zhongda steel structure engineering co. LTD.

Contact: mu guoyu.

Telephone: 13940509290

Email address: muguoyu@zhongdabuild.com

Address: zhai jia development zone, tiexi district, shenyang city.

Zip code: 110178

Liaoning zhongda shengbang industrial co. LTD.

Contact: liu chang.

Telephone: 13889862778

Email address: liuchang@zhongdabuild.com

Address: no. 109, quanyun road, shenyang district, China (liaoning) free trade test zone.

Zip code: 110209

Telephone: 0086-24-89355770 89355771.

Website: en.zhongdabuild.com




huludaoEast tower cross river bridge

huludaoEast tower cross river bridge

  • category:huludaoBridge structure products

  • The number of clicks:
  • Release date:2018/02/28
  • Online inquiry
Detailed description

East tower cross river bridge


East tower cross river bridge.

Across the east tower hun river bridge located in the southeast of shenyang, hun river city section of upstream, 2 km Wang Guwan bridge, evergreen bridge upstream 3 kilometers, engineering north shen water east road, south to muddy south ZhuKe street, total length of 1460 meters.

Among them, the north guide is 320 meters long, the south guide is 340 meters long, and the total length of the middle span is 800 meters. The span of the main bridge is 40+90+220+90+40=480 meters, and the span of the north bridge is 3*40=120 meters, which spans the shore of the north shore beach. The span of the south bridge is 5*40=200 meters, crossing the embankment dam, the south dyke and the east road. The width of the bridge is 43.3 meters in the main bridge and 40 meters in the main bridge without the cable area and the bridge.

Main bridge: five-span continuous steel truss bridge tower self-anchored suspension bridge is a semi-floating system. The span of the bridge is 220m, and the vertical span ratio of the main cable is 1/5.5. The distance between the main cable and the transverse bridge is 36m, and the vertical slope of the bridge is 1%. The main bridge has a vertical curve of 11000m.

Main girder: the steel box girder is used for the whole steel box girder. The steel box girder is 3m in the cable area, and the weight span is 2.3m, and the roof is orthotropic plate structure. The main cable is fixed on the main beam by welding the anchor plate on the steel girder, and the high local thickness of the anchorage beam is 4.8m.



Related tags:

Recently Viewed:

Related Products:

Related news:

share it One key to share
Welcome to leave a message
Please enter your message here and we will contact you as soon as possible.
Name
Contact
Phone
Phone
Email
Email
Address
Address